Owner / Mediterranean Fund
Location / Riyadh – Intersection of Prince Turki Road with Anas Bin Malek Road
Works / Drilling and extension (15,000 m) medium pressure cables and installation 46 stations 13.8 KV
Duration of implementation / 3 months
Owner / Mediterranean Fund
Location / Riyadh – Intersection of Prince Turki Road with Anas Bin Malek Road
Works / Drilling and extension (15,000 m) medium pressure cables and installation 46 stations 13.8 KV
Duration of implementation / 3 months